Several IAs (4003/2025, 3523/2025, 3549/2025, 3574/2025, and 3606/2025) were filed in relation to the Corporate Insolvency Resolution Process (CIRP) of Taurian Engineering Private Limited.
IA 4003/2025 was filed by the Liquidator to take on record the 1st Quarter report, which was taken on record and the IA was disposed of.
IA 3523/2025 was filed for the change of Liquidator, replacing Mr. Rakesh Chaturvedi with Mr. Vikas Kiyani, and was allowed.
IA 3549/2025 sought consideration under Section 60(5) read with Regulation 31A regarding the Stakeholders' Consultation Committee, and was allowed.
IA 3574/2025 sought consideration under Section 60(5) read with Regulation 34 regarding the Asset Memorandum of Taurian Engineering Private Limited, and was allowed.
IA 3606/2025 sought consideration under Section 60(5) read with Regulation 13 regarding the preliminary report of the Corporate Debtor, and was allowed.
Sign in to view the parties.
Start date of the quarter ended for which the…
End date of the quarter ended for which the…
Several IAs (4003/2025, 3523/2025, 3549/2025, 3574/2025, and 3606/2025) were filed in relation to the Corporate Insolvency Resolution Process (CIRP) of Taurian Engineering Private Limited.
IA 4003/2025 was filed by the Liquidator to take on record the 1st Quarter report, which was taken on record and the IA was disposed of.
IA 3523/2025 was filed for the change of Liquidator, replacing Mr. Rakesh Chaturvedi with Mr. Vikas Kiyani, and was allowed.
IA 3549/2025 sought consideration under Section 60(5) read with Regulation 31A regarding the Stakeholders' Consultation Committee, and was allowed.
IA 3574/2025 sought consideration under Section 60(5) read with Regulation 34 regarding the Asset Memorandum of Taurian Engineering Private Limited, and was allowed.
IA 3606/2025 sought consideration under Section 60(5) read with Regulation 13 regarding the preliminary report of the Corporate Debtor, and was allowed.
Start date of the quarter ended for which the…
End date of the quarter ended for which the…