The application IA (IBC) 1764/2025 is filed under Section 12A of the Insolvency and Bankruptcy Code, 2016 read with Regulation 30A of the CIRP Regulations, 2016 for withdrawal of the Corporate Insolvency Resolution Process of M/s. RCM Infrastructure Limited.
An application was filed under Section 12A of the IBC for withdrawal of the CIRP of M/s. RCM Infrastructure Limited.
The CoC approved the withdrawal with 97.53% voting.
A settlement was arrived at between the parties for an amount of Rs.60.70 Crores.
The CIRP initiated against M/s.RCM Infrastructure Limited vide order dated 03.01.2019 is allowed to be withdrawn.
IA (IBC) 312/2025 and IA (IBC) 444/2025 are disposed of as infructuous.
Sign in to view the parties.
Attendance cum order…
CIRP initiated against…
The application IA (IBC) 1764/2025 is filed under Section 12A of the Insolvency and Bankruptcy Code, 2016 read with Regulation 30A of the CIRP Regulations, 2016 for withdrawal of the Corporate Insolvency Resolution Process of M/s. RCM Infrastructure Limited.
An application was filed under Section 12A of the IBC for withdrawal of the CIRP of M/s. RCM Infrastructure Limited.
The CoC approved the withdrawal with 97.53% voting.
A settlement was arrived at between the parties for an amount of Rs.60.70 Crores.
The CIRP initiated against M/s.RCM Infrastructure Limited vide order dated 03.01.2019 is allowed to be withdrawn.
IA (IBC) 312/2025 and IA (IBC) 444/2025 are disposed of as infructuous.
Attendance cum order…
CIRP initiated against…