The case pertains to CP (IB) No. 727/KB/2018 before the National Company Law Tribunal, Kolkata Bench. The matter involves Utpal Kumar Guha (New Engineering Works) as the operational creditor and Simplex Infrastructure Ltd. as the corporate debtor. The hearing was held on September 6, 2019.
The case involves an insolvency proceeding initiated by Utpal Kumar Guha (New Engineering Works) against Simplex Infrastructure Ltd. under Section 9 of the IBC. During the hearing on September 6, 2019, both parties jointly submitted that the matter had been settled outside the Tribunal. Consequently, the operational creditor sought permission to withdraw the Corporate Petition (C.P.). The Tribunal granted permission, leading to the disposal of the case.
Sign in to view the parties.
CP (IB) No. 727…
Hearing held on…
The case pertains to CP (IB) No. 727/KB/2018 before the National Company Law Tribunal, Kolkata Bench. The matter involves Utpal Kumar Guha (New Engineering Works) as the operational creditor and Simplex Infrastructure Ltd. as the corporate debtor. The hearing was held on September 6, 2019.
The case involves an insolvency proceeding initiated by Utpal Kumar Guha (New Engineering Works) against Simplex Infrastructure Ltd. under Section 9 of the IBC. During the hearing on September 6, 2019, both parties jointly submitted that the matter had been settled outside the Tribunal. Consequently, the operational creditor sought permission to withdraw the Corporate Petition (C.P.). The Tribunal granted permission, leading to the disposal of the case.
CP (IB) No. 727…
Hearing held on…