TSN Raja, the Interim Resolution Professional (IRP) for M/s. Panduranga Energy Systems Pvt. Ltd. and M/s. GMP Infrastructure Private Limited, challenged two interlocutory orders dated 16.04.2026 passed by the Adjudicating Authority (NCLT). These orders remitted the matter back to the Committee of Creditors (CoC) with a direction to consider observations made by the NCLT in a previous case (VNR Infrastructure Limited) regarding the appellant's conduct as Liquidator, before approving his appointment as Resolution Professional (RP). The CoC had already approved his appointment as RP with 100% voting on 05.03.2026.
TSN Raja is the Interim Resolution Professional (IRP) for M/s. Panduranga Energy Systems Pvt. Ltd. and M/s. GMP Infrastructure Private Limited.
TSN Raja challenged impugned orders dated 16.04.2026, passed by the Adjudicating Authority (NCLT).
The impugned orders were rendered on IA (IBC) / 588 / 2026 (in CP (IB) / 304 / 7 / HDB / 2022) and IA (IBC) / 589 / 2026 (in CP (IB) / 306 / 7 / HDB / 2022).
The NCLT orders were interlocutory, remitting the matter back to the Committee of Creditors (CoC).
The CoC was directed to consider observations made by the NCLT in orders dated 27.05.2025 & 25.02.2026 in IA No. 742 / 2021 (in CP (IB) / 12 / 10 / HDB / 2017) concerning VNR Infrastructure Limited and the appellant's conduct as Liquidator.
…Sign in to view the parties.
Learned Tribunal passed an order in IA No. 742…
Appellant (TSN Raja) appointed as Interim…
TSN Raja, the Interim Resolution Professional (IRP) for M/s. Panduranga Energy Systems Pvt. Ltd. and M/s. GMP Infrastructure Private Limited, challenged two interlocutory orders dated 16.04.2026 passed by the Adjudicating Authority (NCLT). These orders remitted the matter back to the Committee of Creditors (CoC) with a direction to consider observations made by the NCLT in a previous case (VNR Infrastructure Limited) regarding the appellant's conduct as Liquidator, before approving his appointment as Resolution Professional (RP). The CoC had already approved his appointment as RP with 100% voting on 05.03.2026.
TSN Raja is the Interim Resolution Professional (IRP) for M/s. Panduranga Energy Systems Pvt. Ltd. and M/s. GMP Infrastructure Private Limited.
TSN Raja challenged impugned orders dated 16.04.2026, passed by the Adjudicating Authority (NCLT).
The impugned orders were rendered on IA (IBC) / 588 / 2026 (in CP (IB) / 304 / 7 / HDB / 2022) and IA (IBC) / 589 / 2026 (in CP (IB) / 306 / 7 / HDB / 2022).
The NCLT orders were interlocutory, remitting the matter back to the Committee of Creditors (CoC).
The CoC was directed to consider observations made by the NCLT in orders dated 27.05.2025 & 25.02.2026 in IA No. 742 / 2021 (in CP (IB) / 12 / 10 / HDB / 2017) concerning VNR Infrastructure Limited and the appellant's conduct as Liquidator.
…Learned Tribunal passed an order in IA No. 742…